Baxi Solo 3 Installation And Servicing Instructions page 37

Baxi solo 3 pfl system, wall mounted powered flue system boiler, gas fired central heating unit
Table of Contents

Advertisement

Baffle Retaining Clip
Fig. 95a
Fig. 96
Baffles
Fig. 97
Burner
60, 70 and 80
Models Only
Fig. 99
Fig. 101
Insulation Carrier
Bracket
Pilot Hood
Sealing Washer
Supplied By www.heating spares.co Tel. 0161 620 6677
Electrode
Fig. 100
RH Side Insulation
Pilot Injector
Fig. 102
10.0 Annual Servicing
10.2
Cleaning the Combustion Box
1. Remove the burner assembly by pulling it
forward (Fig. 97).
2. Lightly brush any dirt from the top of the burner
blades and ensure that the ports are free from
obstruction.
3. Remove the baffle retaining clip and lift the
baffles from the heat exchanger (Fig. 95a & 96).
10.3
Cleaning the Heat Exchanger
Fig. 98
1. The heat exchanger may be cleaned by
insertion of a thin metal strip e.g. a hack saw
blade or steel rule, from above or below, taking
care not to damage any insulation.
2. Clean the front and rear fin sections and
ensure that any blockages are cleared.
10.4
Cleaning the Burner Injector
1. Remove the injector which is screwed into the
burner feed manifold (Fig. 99).
2. Examine and clean carefully, then replace
ensuring that the copper washer is in position.
Tighten the injector fully.
10.5
Cleaning the Pilot
1. Disconnect the spark electrode lead at the
electrode (Fig. 100).
2. Unscrew the electrode from the manifold and
withdraw the electrode (Fig. 100).
3. Remove the right hand side insulation carrier
bracket by releasing the screw. Remove the side
insulation (Fig. 101).
4. Release the screw securing the pilot hood and
remove (Fig. 102).
5. Carefully remove the pilot injector (Fig. 102).
Examine and clean it as necessary. Do not use a
wire or pin to clean the injector orifice.
6. Examine the sealing washer (Fig. 102) and
replace if it is damaged in any way. Reassemble
in reverse order.
7. Replace all components in reverse order
ensuring that the flexible tubes from the fan
unit to the pressure switch are routed
correctly and that they are not kinked or
flattened (Fig. 95).
8. Check that the seal to the combustion box door
is good.
9. Re-commission the boiler before use, checking
for gas soundness and ensuring all controls are
working correctly.
10. Complete the relevant section of the
"Benchmark" Installation, Commissioning and
Service Record Log Book and hand it back to the
user.
37