Installation - Baxi Solo 3 Installation And Servicing Instructions

Baxi solo 3 pfl system, wall mounted powered flue system boiler, gas fired central heating unit
Table of Contents

Advertisement

Lower Door Panel
Outer Case
Fixing Screw
Door Stay
Fig. 14
Hooks
Wall Plate
14
Supplied By www.heating spares.co Tel. 0161 620 6677
Fig. 13
Back Plate Slots
Retaining Latch

6.0 Installation

6.1
Initial Preparation
1. Open the hinged lower door panel and
carefully disengage the door stay. Remove the
door by opening it 90° and pulling forward
(Fig. 13).
2. Remove the 2 screws holding the outer case
to the combustion box (Fig. 13).
3. Place the outer case in a safe place until
required.
4. Remove the R clip from the latch securing the
combustion box to the back plate and release
the latches (Fig. 14a & 14b).
5. Lift and remove the combustion box and
backplate from the wall plate (Fig. 14). Place the
combustion box and backplate on its back.
IMPORTANT - When installing a Solo 3
System with a rear flue see section 6.2 Fan
Outlet Restrictor before continuing the
installation.
6. Proceed to the relevant section for flueing the
appliance either to the Rear, Left, Right or
Vertically.
NOTE: For Vertical flueing or flue lengths
greater than standard, the relevant optional
extra kits must be obtained and their
instructions followed.
'R' Clip
Fig. 14a
Fig. 14b

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents