Baxi Solo 3 Installation And Servicing Instructions page 31

Baxi solo 3 pfl system, wall mounted powered flue system boiler, gas fired central heating unit
Table of Contents

Advertisement

Fig. 74
Fig. 76
Pump Earth
Pump Neutral
Pump Live
Fig. 77
Supplied By www.heating spares.co Tel. 0161 620 6677
1. Remove the cover from the control box by
removing the 2 screws (Fig. 74).
2. Slide the box forward for easier access.
3. Route the supply cable via the control box from
the rear of the appliance.
4. The terminal strips may be removed by
carefully pulling forward. Connect the supply
cable to the terminal strip (Fig. 77).
Fig. 75
5. The pump is connected to the boiler P.C.B.
terminals.
6. A permanent live must be connected to the 'L'
terminal.
7. The switched live must be connected to the
'S/L' terminal.
8. Clamp the cable in the grip provided. Ensure
that the length of the supply cable is such that the
current carrying wires become taut before the
earth wires if the cable should pull out of the cable
clamp (Fig. 76).
9. Tuck the cable along the side of the box and
clip to the wall where necessary. Make sure
sufficient slack is left to allow the box to slide
forward for future access. A cable clip is fitted at
the side of the box.
10. For optional integral clock kit follow
instructions provided.
Switched Live
Permanent Live
Neutral
Earth
6.0 Installation
6.18
Making the Electrical Connections
IMPORTANT - When installing in conjunction
with a thermal store or heat store please refer
to the store manufacturers installation
instructions when wiring the boiler.
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents