Download Print this page

DeDietrich GT 120 Installation Instructions Manual page 30

Fuel oil/gas-fired boilers
Hide thumbs Also See for GT 120:

Advertisement

Mounting GTU 120 - GTU 1200
8
Replacing the front cover and the top
A: The self-tapping screws + washers can be found in the screw bag.
9
Levelling
(1) Basic dimension 25 mm. Can be adjusted from 25 mm to 40 mm.
If the boiler is placed on a L160 or L250 tank, screw in the feet as far as they will go.
30
GT/GTU 120 - GT/GTU 1200
02/11/05 - 300003690-001-A

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Gt 1200