Download Print this page

DeDietrich GT 120 Installation Instructions Manual page 18

Fuel oil/gas-fired boilers
Hide thumbs Also See for GT 120:

Advertisement

Mounting GT 120 - GT 1200
14
Fitting the burner
A: 4 allen key (delivered with the burner).
Affix the flange and its gasket.
Push the burner fully into place. Position it in the lower notch B.
Secure the burner.
Fit the cable clamp to the side panel.
Fit the cable clamps on the side of the burner cable, opposite the combustion door hinges.
Remove the cover. Connect the connector to the burner socket. Adjust the length of the cable so that it is necessary to disconnect the
burner cable to open the door of the combustion chamber.
Secure the cable. Slide the surplus cable between the insulation and the side panel.
Replace the burner cover.
18
1
GT/GTU 120 - GT/GTU 1200
02/11/05 - 300003690-001-A

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Gt 1200