1 GT 120
The following table gives the package numbers which make up the boiler to be installed.
The packages are presented in the order in which they should be opened for assembly.
Boiler
Boiler body
Cladding
+
Insulation
Control panel
(1) or package FM 15 (basic control panel)*
(2) or package FM 102 (E control panel with outside sensor)*
(3) or package FM 18 (Control panel E1)*
(4) or package FM 101 (Diematic 3 control panel without CDI2)*
The assembly of any optional equipment delivered with the boiler is covered in the instructions which accompany it.
The range of optional equipment available is given in the current price list.
* Delivered until the beginning of 2005 but not compatible with tank packages BH 103 and BH 104.
02/11/05 - 300003690-001-A
GT 123
GT 124
FM 1
FM 2
FM 10
FM 11
All models can be equiped with one of the following control panels:
- Control panel B/TA (basic control panel)
- Control panel E/TA (Easymatic)
- Control panel E1/TA (Easymatic 1)
- Control panel ER/TA (Easyradio)
- Control panel E1R (Easyradio 1)
- Control panel D/TA (Diematic 3)
- Control panel X
GT/GTU 120 - GT/GTU 1200
Package list
GT 125
GT 126
FM 3
FM 4
FM 12
FM 13
(1)
FM 126
(2)
FM 127
(3)
FM 128
FM 130
FM 134
(4)
FM 129
FM 19
Package list
Contains the boiler instructions
Contains the control panel instructions
3