Download Print this page

DeDietrich GT 120 Installation Instructions Manual page 11

Fuel oil/gas-fired boilers
Hide thumbs Also See for GT 120:

Advertisement

6
Assembling the cross-bar support for the control panel
1. Put the cross-bar support in place on the boiler body. Position it on:
- The M8 (A) pins to the front,
- The assembly rod (B) and the positioning nipple on the 3rd section (C).
2. Secure the cross-bar at the front using 2 flanged nuts HM8 (D).
3. Secure the cross-bar to the 3rd section using:
- 1 screw HM8 x 30 (E) + flanged nuts (D),
- 1 flanged nut (D) on the assembly rod.
Fitting the rear cross-bar (GT 125/1205 - GT 126/1206 only)
02/11/05 - 300003690-001-A
GT/GTU 120 - GT/GTU 1200
Mounting GT 120 - GT 1200
11

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Gt 1200