Miele H6200BP Operating And Installation Instructions page 103

Hide thumbs Also See for H6200BP:
Table of Contents

Advertisement

At the end of the activation phase the
steam injection system will need to be
cleaned to remove all traces of
descaling solution.
Cleaning is carried out by flushing
approx. 1 litre of fresh tap water
through the system. The water is
collected in the universal tray. This
process is repeated three times.
M Take the universal tray out of the
oven and empty it. Place the tray
back in the oven again on the top
shelf level.
N Detach the plastic tube from the
container.
O Rinse the container and fill with
approx. 1 litre of fresh tap water.
P Place the container back in the oven,
insert the plastic tube, secure it to
the container and close the door.
Q Touch the OK sensor.
Cleaning and care
The first rinse will be shown in the
display as E 2.
Water will be flushed through the steam
injection system and will then collect in
the universal tray.
R Take the universal tray out of the
oven and empty it. Place the tray
back in the oven again on the top
shelf level.
S Detach the plastic tube from the
container. Fill it with approx. 1 litre of
fresh tap water.
T Place the container back in the oven,
insert the plastic tube, secure it to
the container and close the door.
U Touch the OK sensor.
The second rinse will be shown in the
display as E 3.
V Repeat the last four steps.
The third rinse will be shown in the
display as E 4.
Leave the universal tray (with the
water which has collected in it) on the
top oven shelf whilst the evaporation
process takes place.
W Remove the container and tube from
the oven.
103

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents