Viessmann VITOSOL 200-T SD2A 2m2 Series Installation Instructions Manual page 28

Table of Contents

Advertisement

Installation on Flat Roofs
Installing the Mounting Rails
a
b
Turn T-slot bolt 90° for all installation
steps.
9.1" /
230mm
28
(continued)
2.
c
2x
4.
90º
6.
1. Position ballast weights on a solid
2. Attach clamping brackets
3.
3. Click the mounting rails
4. Secure the retaining plates
5. Fit clamping brackets
6. Click the mounting rails with tube
5.
90º
The tube holders on the installation rails
must be in alignment with those in the
connection housing; align with string if
necessary.
Note:
Please see page 25 for numbered parts
description.
surface on protective mats.
ballast weights
and
tighten the bolts.
clamping brackets
, align and
tighten.
Dimensions
inches
a
mm
inches
b
mm
inches
c
mm
mounting rails
.
mounting rails
; do not yet tighten
the bolts.
holders
into the clamping brackets
, align and fasten.
IMPORTANT
to
; do not yet
into the
7.4
187.5
64.0
1650
7.4
187.5
to the
onto the

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vitosol 200-tsd2a 3m2 series

Table of Contents