Lifting the Loader
The loader can be lifted using a single-point or four-point lift kit, which are
available from your authorized Gehl dealer.
WARNING
Before lifting, check the lift kit for proper installation.
Never allow riders in the operator's compartment (ROPS) while
the loader is lifted.
Keep everyone a safe distance away from the loader while it is
lifted.
Loader may only be lifted with an empty bucket or empty pallet
forks, or with no attachment.
attachments other than those stated.
Lift
equipment
used
installation is the responsibility of the
party conducting the lift. All rigging
comply
with
MUST
regulations and guidelines.
1. Using suitable lift equipment,
hook into the lift eyes (refer to
Figs. 30, 31 and 32). Adjust the
length of the slings or chains to lift
the loader level.
Important: As needed, use a
spreader bar to prevent the slings or
chains from rubbing the sides of the
ROPS.
2. Center the hoist over the ROPS.
To prevent shock loading of the
equipment
and
swinging of the load, slowly lift
the loader off the ground.
Perform all movements slowly
and gradually.
908274/BP1202
Never lift the loader with
and
its
applicable
Fig. 30: Four-Point Front Lift Eye
excessive
Fig. 31: Four-Point Rear Lift Eye
Fig. 32: Single-Point Lift Eye
44

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl7800

Table of Contents