To connect Natural Gas, use a fitting with 3/8" NPT nipple
on the valve side and 1/2" natural gas supply line with an
input of 28,000 BTUs at a manifold pressure of 3.5" and
minimum inlet supply for adjustment of 5.5" w.c.
THIS APPLIANCE SHOULD BE CONNECTED TO
THE GAS SUPPLY ONLY BY A QUALIFIED GAS
SERVICE TECHNICIAN.
THERE MUST BE A GAS SHUT-OFF BETWEEN THE
STOVE AND THE SUPPLY.
To connect Propane, use a fitting with 3/8" NPT nipple on
the valve side and 1/2" propane gas supply line with an
input of 28,000 BTUs at a manifold pressure of 10.0" and
minimum inlet supply for adjustment of 11.0" w.c.

Install ON/OFF Switch

The switch assembly parts are found in the parts bag.
1. Attach switch assembly to left rear side of stove shroud
(when facing shroud) using two screws and existing
holes in shroud. (Figure 50)
2. Run wires down back of stove, under bottom of rear
shroud to valve.
3. Attach wires to valve terminals. (Figure 51)
Switch
Assembly
Screws
Figure 50 Attach switch assembly to rear shroud.
SIt Valve
Thermopile
ON/OFF Switch or
Millivolt Thermostat
Figure 51 Install wiring to switch before connecting to valve.
28
Existing Holes
Valve
ST315
attach switch assy
1/31/00 djt
FP1622
SIT valve w/switch

Thermostat Connection (optional)

Use only a thermostat rated for 500 millivolts.
Check the table below for the appropriate gauge thermo-
stat wire to use for the length of lead required in your in-
stallation.
Thermostat
Wire / Gauge
1. Install the wall thermostat in the desired location and
run the wires to the stove location. Terminate these
leads with 1/4" female connectors.
2. Connect the thermostat wires to the valve. (Figure 51)
Receiver Installation - SDDVTCS Series
Once the blower is installed to the back of the SDDVTCS
Series stove, install the receiver.
1. Slide receiver into igniter bracket as shown in Figure
52.
2. Attach igniter bracket with receiver to valve with #10-
32 x 1/4 screws supplied.
3. Connect receiver wiring to valve as shown on Page
43, Figure 91.
4. Plug igniter wire from burner into the back of the igniter
bracket.
Receiver installation complete.
ST315
ST1121
Figure 52 Install receiver.
FP1622
Maximum Run
18
20 feet
16
20 - 40 feet
14
up to 60 feet
Valve
ST1121
receiver install
Receiver
Igniter
Bracket
20306760

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

SddvtcsbssbSddvtcscbsbSddvtcsbmsb

Table of Contents