Burner Information; Complete The Assembly; Install On/Off Switch; Install The Front Plate - Vermont Castings Intrepid INDVR Series Installation & Operating Manual

Direct vent gas heater
Table of Contents

Advertisement

Burner Information

The appliance must only use the gas specified on the rating
plate, unless converted using a Vermont Castings Fuel
Conversion Kit. Refer to Page 42 for correct Fuel Conversion
Kit for your stove model.
Coversion instructions are provided with each kit and
beginning on Page 34 of this manual.
THIS APPLIANCE SHOULD BE CONNECTED TO THE
GAS SUPPLY ONLY BY A QUALIFIED GAS SERVICE
TECHNICIAN. FOLLOW ALL LOCAL CODES.
THERE MUST BE A GAS SHUT-OFF BETWEEN THE
STOVE AND THE SUPPLY.

Complete the Assembly

• Open the swiveling latches (cams) on the top left and right
corners of the glass frame.
• Position the glass and frame against the firebox by placing
the bottom edge on the brackets on the bottom face of
the firebox.
• Swing the assembly against the firebox, and close the
latches firmly against the pins protruding from the firebox
top.

Install ON/OFF Switch

The switch assembly parts are found in the parts bag.
1. Apply wiring harness to the ON/OFF switch terminals then
insert into cut out on switch housing. The ON/OFF switch
will 'snap' into the cutout. (Figure 55)
2. Run wires through cut out in side of shroud, under bottom
of rear shroud to valve.
3. Using supplied #10 x 1/2" screws, attach switch housing
over cut out opening in rear shroud.
4. Attach wires to valve terminals. (Figure 56)
Wire
Harness
Switch As-
sembly
Screw
Figure 55 - Attach switch assembly to rear shroud.
28
ST1120
Figure 56 - Attach switch wires to valve.

Install the Front Plate

ST228
Grasp the Front Plate and lift it into position, engaging the two
attach switch
steel tabs at the upper corners behind the adjacent bosses in
wires to valve
the Side Plates. (Figure 57) Seat the Front against the Sides
12/99
so that the tabs at the bottom lip engage with the notches in
the edge of the stove base.
When properly installed, the bottom of the Front Plate cannot
be pulled away from the sides without also lifting it up.
If you are installing optional Warming Shelves, do so now,
according to the instructions supplied with that kit.
Bottom Tabs Engage
Notch in Base
Figure 57 - Install stove front.

Thermostat Connection

(Optional) R Models Only
Use only a thermostat rated for 500 - 750 millivolts.
Check the table below for the appropriate gauge thermostat
wire to use for the length of lead required in your installation.
Thermostat
Wire / Gauge
18
20
22
1. Install the wall thermostat in the desired location and run
the wires to the stove location. Terminate these leads with
1/4" female connectors.
2. Connect the thermostat wires to the valve. (Figure 56)
This completes assembly of the Intrepid stove.
ST967
Intrepid install front
7/07
Maximum Run
40 feet
25 feet
16 feet
20012761

Advertisement

Table of Contents
loading

This manual is also suitable for:

Intrepid indvrcbsb

Table of Contents