Step 8. Cable connection – Use the power cables that came with the subsystem to
Step 9. Power Up – Once all the components have been properly installed and all the

2.5. Unpacking the Subsystem

The ES U16U subsystem will be packed in two separate levels as shown in Figure 2- 1
below. Carefully check the items contained in each box before proceeding with
installation.
NOTE:
A detailed packing list can be found in the Appendix D of this manual.
Figure 2- 1: Side View of the Packing Case
Upper Level:- The boxes on the upper level contain:
♦ 16 drive trays
♦ controller modules
♦ battery modules (Optional item for single controller subsystems)
♦ accessories
Lower Level:- The lower box should contain the enclosure chassis with all the pre-
installed components. The pre-installed components should include:
♦ PSU modules
♦ LCD panel
♦ Cooling FAN modules
2-6
connect to the subsystem to the mains. Use separately purchased SCSI cables
to connect the host ports to the host computers. (See Chapter 4)
cables properly connected, the subsystem can be powered up and the RAID
array configured. (See Chapter 4)