Installation Procedures; Unpacking The System; Preparing For The Installation - Infortrend EonStor GSe Pro 108 Hardware Manual

Table of Contents

Advertisement

2.2

Installation procedures

This section details the installation procedures of the system, its components, and connections between
equipment. The installation procedures in this section are in order, so it is strongly recommended
that you follow the said order to reduce the time consumed during installation and prevent installation
mistakes, technical mishaps, or physical injuries.
2.2.1

Unpacking the system

When your system package has arrived, check and confirm if the contents of your package are complete
by referring to the Unpacking List document, which is bundled with in your package.
Accessory box contents
This box contains the following:
RS-232C serial cable (mini USB to DB-9 cable)
Screws (for 2.5 and 3.5 inch drives)
Quick installation guide
EonOne Quick Start Guide
EonOne CD
LAN cable
Power cord
Pre-installed components
Below are the components that are pre-installed in the system:
LED front panels
DIMM modules
M.2 flash module
Drive trays
Components that need user installation upon unpacking
You must do the following installation:
Assembling the drives to the drive trays
Installing the host/expansion board to the system
Cabling in between systems
2.2.2

Preparing for the installation

Before you start the system installation, you must prepare the following:
1 Small-sized flat blade screwdriver
2.5-inch or 3.5 inch disk drives (supports up to 3 TB each drive)
2-2
Chapter 2: Hardware installation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eonstor gse pro 105Eonstor gse pro 100 series

Table of Contents