Site Preparation - Sub-Zero Integrated Refrigeration Installation Manual

Integrated refrigeration
Hide thumbs Also See for Integrated Refrigeration:
Table of Contents

Advertisement

Site Preparation

Opening Dimensions
INTEGRATED MODELS
25"
(635)
OPENING DEPTH
SIDE VIEW
Opening Width
700TR, 700TF(I) and 700TC(I)
700BR, 700BF(I) and 700BC(I)
736TR, 736TFI and 736TCI
TOP VIEW
25"
(635)
OPENING
DEPTH
B
A
OPENING
OPENING WIDTH
HEIGHT
FRONT VIEW
IMPORTANT NOTE: The depth of each integrated model is
A
24" (610) from the front of the unit to its back. Your design may
27"
(686)
necessitate moving the unit back or cabinets forward to achieve
27"
(686)
a flush fit. This will require a minimum rough opening depth of
36"
(914)
25" (635).
6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

700tr700tf(i)700tc(i)700br700bf(i)700bc(i)

Table of Contents