Sub-Zero Integrated Refrigeration Installation Manual page 14

Integrated refrigeration
Hide thumbs Also See for Integrated Refrigeration:
Table of Contents

Advertisement

Integrated Installation
Kickplate/Grille Installation
Once the integrated unit is secured, the kickplate/grille
can be installed. The mounting bracket may be adjusted
slightly forward or back so the kickplate/grille will fit flush
with the surrounding area. Refer to the illustration below.
The kickplate/grille must be removable for servicing. The
floor cannot interfere with removal.
IMPORTANT NOTE: The unit must be allowed to have
ventilation through the fins of the kickplate/grille. You may
cover the solid area, but do not block the fins. The lower
drawer panel may hang in front of the fins, but the base-
board molding must not cover them.
Turn power back on to the electrical outlet.
MOUNTING
BRACKET
Kickplate/grille installation.
The kickplate/grille may be painted another color, if
desired. Follow these easy steps:
Rough up the surface to be painted with fine grit sand-
paper.
Wipe with alcohol to ensure that the surface is clean
and dry.
Use an appliance or industrial grade, oil base, high
gloss enamel paint.
14

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

700tr700tf(i)700tc(i)700br700bf(i)700bc(i)

Table of Contents