Download Print this page

Site Preparation - Sub-Zero UC-24CI Installation Manual

Hide thumbs Also See for UC-24CI:

Advertisement

Site Preparation

Before You Start
Make sure the opening dimensions, door clearance,
electrical service and plumbing are correct for the model
you are about to install. Refer to specifications on the
following pages.
IMPORTANT NOTE: To operate properly, the door must
open a minimum of 90°. Use a minimum 3" (76) filler in
corner installations to assure a 90° door opening. Allow
enough clearance in front of the unit for full door swing.
TOOLS AND MATERIALS REQUIRED
Appliance dolly able to support 130 lbs (59 kg)
Level — 2' (.6 m) and 4' (1.2 m) recommended
Phillips and slotted screwdriver sets
Wrench set and allen wrench set
Crescent wrenches
Various sized pliers
5
/
" hex bolt nut driver
16
Drill and assorted drill bits
1
4' (1.2 m) of
/
" copper tubing and saddle valve
4
(4200880) for the water line (model UC-24CI)
Copper tubing cutter (model UC-24CI)
1
Masonite, plywood,
or other suitable material to protect finished flooring
subzero.com/specs
/
" pressed fiberboard, cardboard
8
5

Advertisement

loading

This manual is also suitable for:

Uc-24bgUc-24roUc-24cUc-24r