Adf Test - Toshiba e-STUDIO170F Owner's Manual

Toshiba e-studio170f multifunction fax owner's manual
Hide thumbs Also See for e-STUDIO170F:
Table of Contents

Advertisement

ADF TEST

The ADF test checks the op-
1
eration of the ADF by trans-
porting and unloading docu-
ments. You can check that the
ADF is normal if the number of
Press:
documents loaded is consis-
tent with the number of docu-
ments transported and un-
loaded.
You can change the transport
speed by pressing
220
2
Select the ADF TEST
Menu
Load the documents in the
MENU
document support.
+
+
Press:
+
+
The documents will be trans-
ported one by one and the
number of documents unloaded
will be displayed at the lower
right on the screen.
ADF TEST
LOAD DOCUMENT
To end the test, press:
.
MODE
STD:
Fast
Go to Step 3.
FINE (Same when HALF
TONE is set): Medium
ADF TEST
U-FINE (Same when HALF
1.OK
TONE is set): Slow
Load the Documents
If a document jam occurs dur-
ing transport, the screen below
is displayed.
ADF TEST
PRESS[START]
ADF TEST
DOCUMENT JAM
Remove the jammed docu-
START
ments, the screen below is dis-
played.
ADF TEST
[STOP] TO COMPLETE
To continue the ADF Test,
press:
ADF TEST
PAGES
01
Return to Step 2.
STOP
2.NG
3
Select the ADF Test
Result
If the number of documents
loaded is consistent with the
number of documents unload,
press:
If a document has not fed prop-
erly (even once), press:
START

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-studio 170f

Table of Contents