Clearances From Combustibles - Real Flame Hot Box Installation & Operating Manual

Real flame hot box gas firebox installation & operating manual
Hide thumbs Also See for Hot Box:
Table of Contents

Advertisement

COMMISSIONING PROCEDURE
WARNING
Care must be taken to ensure that any return air register exhaust system does not
adversely affect the operation of the appliance or draught of chimney or flue.
"DO NOT place articles on or against this appliance."
"DO NOT use or store flammable materials near this appliance."
"DO NOT spray aerosols in the vicinity of this appliance while it is in operation."

CLEARANCES FROM COMBUSTIBLES

425mm
DIAGRAM 1.
Floor
Sides
Back
Top
Flue Outer
6
(continued)
930mm
PLAN
0 mm
25 mm
25 mm
100 mm
25 mm
25mm
Cast iron
fascia
A minimum of 3.6m
flue is required to
protrude 500mm
above roof line.
Flue can be offset
with two 45° bends,
no more than 20% of
overall height of flue.

Advertisement

Table of Contents
loading

Table of Contents