Page 1
Read this manual before you use this Nailer. Follow all safety warnings and instructions. If you are uncertain about the operation of the Nailer, call us directly a 1-800-323-1653 for assistance or contact the closest Powernail dealer for help. Please retain this information for future reference. 02.07...
Page 2
MODEL 45R PARTS LIST ITEM PART NO. DESCRIPTION QTY. REQ’D. 08-45-00-010 SPRING CLIP 08-45-00-020 FEEDER CHANNEL 08-45-00-050 ROLLER PIN ASSEMBLY 08-45-00-05R ROLLER 08-45-00-130 FOOT SCREW 08-45-00-13N LOCKNUT 08-45-00-140 GATE 08-45-00-150 FOOT 08-45-00-960 SPRING CONTAINER SCREW 08-45-00-170 SPRING CONTAINER 08-45-00-180 FEEDER SPRING...
Page 3
MODEL 45R PARTS LIST IMPORTANT When ordering repair parts, specify both model and serial number...
Page 4
POWERCLEAT ® NAIL LENGTH CHART This chart will assist you in determining the proper length of Powercleat nails to use for various thicknesses of fl ooring when sub-fl ooring member varies as to species and thickness. Vertical penetration of the Powercleat nails under the hardwood fl oor is shown for each application.
Page 5
MODEL 45R & 101R RATCHET REPAIR INSTRUCTIONS • • With a 5/32 allen wrench, unscrew the two #10-32 socket Replace access plate. Important: Make sure access plate is head cap screws from the access plate. replaced as shown, with indent facing in towards ratchet.
Page 6
REPLACING #38 DRIVING BLADE 1. Remove #5 Roller Pin—save Cotter Pin. 6. Holding Nailer in left hand with Nailer so rear of Nailer is down, slowly insert Plunger Head and Driving Blade 2. Holding Nailer in left hand with Nailer tilted so rear of Nailer Assembly into Nailer Body, making certain the #45 is down, depress #37 Plunger Head slightly so #5R Roller Plunger Spring is inserted into hole in Plunger Head.
Need help?
Do you have a question about the 45R and is the answer not in the manual?
Questions and answers