Choosing The Installation Site - Avaya G350 Quick Start For Hardware Installation

Hide thumbs Also See for G350:
Table of Contents

Advertisement

Before you Start

Choosing the Installation Site

Ensure that the location where you install your G350 fulfills the following requirements:
Cables are away from sources of electrical noise such as radio transmitters, broadcast amplifiers,
power lines, fluorescent light fixtures
Water or moisture cannot enter the case of the chassis.
Air can flow freely around all sides of the chassis.
The vents on the sides of the case are not blocked.
The installation is no more than 25 feet (7.6 m) from an approved ground.
Note:
If the G350 is more than 25 feet away from an approved ground, you must contact a licensed
Note:
electrician to install a supplementary ground conductor.
The environmental conditions match the following requirements:
Ambient temperature – 32
Relative humidity – 20-60% relative humidity
Minimum clearance for ventilation – 18 in. (45 cm)
Weight support – 20-22 lbs (9-10 kg)
8 Quick Start for Hardware Installation: Avaya G350 Media Gateway
o
o
o
o
to 104
F (0
to 40
C)

Advertisement

Table of Contents
loading

Table of Contents