Por (Power-On Reset) Sequence - Lexmark C540n Service Manual

Hide thumbs Also See for C540n:
Table of Contents

Advertisement

5025-2xx, 4xx

POR (Power-On Reset) sequence

The following is an example of the events that occur during the POR sequence for the base machine with no
paper handling options installed.
When you turn the printer on, it performs a Power-On Self Test. Check for correct POST functioning of the base
printer by observing the following:
The LED turns on.
1.
2.
The main fan turns on.
The operator panel turns on.
3.
A partial row of pixels appears.
4.
The operator panel display clears.
5.
Another row of pixels appears.
6.
7.
The operator panel display clears again.
The operator panel displays system information. For example:
8.
The fuser turns on. The fuser takes longer to warm up from a cold start than a warm start.
9.
The operator panel LED starts blinking.
10.
The following errors or messages may appear:
11.
Close Door or Insert Cartridge displays if the upper front cover is open or the print cartridge is
missing.
Any cartridge errors, such as Defective Cartridge or Missing Cartridge.
Ready appears on the display.
12.
The main drive motor turns on.
13.
14.
The EP drive assembly drives the developer shaft located in the toner cartridge.
The printer calibrates.
15.
Service Manual
2-2
*128MB
500Mhz
Previous
Next
Go Back

Advertisement

Table of Contents
loading

Table of Contents