Installation space
1. Align the servicing surfaces of the outdoor units and connect them for installation.
2. Considering functions, reserve space necessary for construction and servicing.
(The figure at lower right side shows a case that 3 units are installed connectively.
Air inlet
Air inlet
Installation work/
servicing surface
Square hole for handling
NOTES :
(1) If there is an obstacle at upper side of the outdoor unit, reserve space of 2000mm or more up to the top end
of the outdoor unit.
(2) Install the outdoor unit so that height of obstacle surrounding the outdoor unit is kept 800mm or less from the
bottom end of the outdoor unit.
(3) If height of obstacle surrounding the outdoor unit is higher than the outdoor unit, measures such as discharge
duct being installed is required.
[1] Outdoor unit carrying in
Handle the outdoor unit in care with the following items.
1. When using a forklift, etc for loading/unloading in transportation, insert pawl of the forklift into the square hole
for handling as shown below.
2. When lifting up the unit, insert a rope sufficiently bearable to unit mass into the square hole for handling, and
cord the unit from four sides. (Apply a plaster to position where rope fits outdoor unit itself so that flaw or
deformation does not generate on the outer surface of the outdoor unit.)
(There provided the reinforcing plates on the side surfaces, so the rope cannot be passed.)
Forklift
Air outlet
500mm or more
Air inlet
Air inlet
500mm or more
Forklift
Square hole for handling
Outdoor unit top view
(Rear side)
10mm
or more
20mm or more
(Front side)
(A case of 3 units are installed.)
Plaster
Rope
Plaster
80
10mm
or more
20mm or more
Reinforcing plate