Panel Installation - Sub-Zero Built-In Refrigeration Installation Manual

Built-in refrigeration
Hide thumbs Also See for Built-In Refrigeration:
Table of Contents

Advertisement

Built-In Installation
Air Purification System
All Sub-Zero built-in units, except model BI-36F, come
with an advanced air purification system. A factory
installed air purification cartridge is located inside the
refrigerator section, on the right-hand side of the back
wall. For information regarding use and removal of this
cartridge, refer to the built-in use & care guide provided
with the unit.
Lamp contains mercury. Manage in accordance with
disposal laws. Go to subzerowolfstore.com or call
1-800-222-7820.

Panel Installation

Before you begin installing panels, refer to the panel spec-
ifications for framed, overlay or flush inset applications
and be sure you are working with the panel design called
for in your installation. If your customer has chosen the
stainless steel design, the unit has been shipped complete
with a finished stainless steel look. It will not be necessary
to install panels or handle hardware. In your final prepara-
tion for stainless steel units, use a stainless steel cleaner
to remove any marks. Abrasive cleaners should not be
used, as they may scratch the surface.
If your customer has ordered either a framed or overlay
model, you will be installing panels to give the unit the
custom Sub-Zero look.
IMPORTANT NOTE: For overlay models, there are two
design applications, overlay and flush inset. Be sure to
use the correct panel sizes for your application.
23
subzero.com

Advertisement

Table of Contents
loading

Table of Contents