Harsco Industrial C1500H Installation & Owner's Manual page 70

Gas fired boiler natural gas/propane/dual fuel
Hide thumbs Also See for C1500H:
Table of Contents

Advertisement

6.2.2
Main Assembly MACH
1
Back of Boiler
®
NOTICE! For a MACH
LP gas.
®
For a MACH
C4000GG, the top connection is propane or LP gas and the rear connection is natural gas.
®
C2500/C3000/C4000 Natural Gas, Propane and Dual Fuel (GG) Boilers
3&4
Side of boiler
C2500GG/C3000GG, the top connection is natural gas and the rear connection is propane or
8
3&4
5
2
9
7
6
70
®
MACH
Gas Fired Boiler
1. Boiler supply
2. Boiler return
3. Nat. gas inlet (see
note below)
4. LP gas inlet (see
note below)
5. Relief valve
6. Condensate drain
7. Boiler drain
8. Combustion air inlet
9. Exhaust vent

Advertisement

Table of Contents
loading

This manual is also suitable for:

C2000hC2500C3000C4000

Table of Contents