Panasonic M2X Series Instruction Manual page 5

For 3-phase induction motor speed control
Table of Contents

Advertisement

■ Wiring
● Make sure the power is cut off before handling wiring.
Failure to do so could result in electrical shock or fire.
● Be sure to install a no-fuse breaker (NFB) or an earth leakage breaker.
Failure to do so could result in fire.
● Be sure to ground the GND terminal.
Failure to do so could result in electrical shock or fire.
● Have wiring work done a licensed electrician.
Failure to do so could result in electrical shock or fire.
● Be sure to install the inverter before wiring.
Failure to do so could result in electrical shock or fire.
● Do not ground the AC power source with the output terminals (U/T1, V/T2,
W/T3).
Doing so could result in injury or fire.
● Make sure the voltage of the AC power source agrees with the rated voltage of the
inverter.
If not, it could result in injury or fire.
! ! ! !
DANGER
! ! ! !
CAUTION
- 5 -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents