Install Megaball™ 2 Dome Version (-D Models) - Arecont Vision AV2245PM-W Installation Manual

Megaball 2 pm models (remote zoom, remote focus, p-iris)
Hide thumbs Also See for AV2245PM-W:
Table of Contents

Advertisement

Install MegaBall™ 2 Dome Version (-D Models)
Mounting the Camera:
1. Remove the camera and hardware from the
box.
2. Using the mounting template, prepare the
mounting surface for camera installation.
3. Plug Ethernet cable into the MegaBall™ 2
PoE female RJ45 connector. (Image 5)
NOTE: If the camera will be powered via
PoE, please skip to step 5.
Image 5
4. If the camera will be powered by an AC 24V
or DC 12-48V power supply, connect
auxiliary power to terminal block on pigtail
cable connector.
NOTE 1: Ensure that the polarity of the DC
input on the camera matches the way that
the wires are installed in the connector
shown in Image 5.
NOTE 2: AC power does not have polarity.
PoE RJ45
Digital In
Alarm Out
Auxiliary Power
5. Using the provided Security L-key (Image
1F), loosen the three (3) screws securing
the dome cover (Image 6). Remove the
vandal resistant dome cover.
NOTE: Do not remove the screws from the
dome cover.
Image 6
6. Loosen the three (3) machine screws
(Image 7) and remove the in-ceiling mount
camera from the surface mount housing.
Screws
Image 7

Advertisement

Table of Contents
loading

Table of Contents