Float Switch; Reverse Osmosis System; Starting Operation; Metering Station - Kärcher WATERCLEAN 600 CD Service Handbook

Karcher water system user manual
Table of Contents

Advertisement

OPERATION OF THE SYSTEM
3.3.2.4

Float Switch

Connect the signal lines of the enclosed float switch to clamps 6/7 (8S3 option) of the
connecting terminal – compare wiring diagram in the switching box. Upon installation, adjust a
switching hysteresis of at least 300 liters between the switching-on and switching-off point.
3.3.2.5

Reverse Osmosis System

The WTC 600 LP/MP is connected to the following power supply:
- 400 V / 50Hz, 3Ph + N + PE or 230 V / 50Hz, 1Ph + N + PE (depending on type of system)
- Fuse protection 16 A
- RC protective switch 30 mA from source of power supply (check if in existence or have
confirmed in writing).
3.4

Starting Operation

Operation of the individual equipment components is started in the following sequence:
- Fill the preliminary filter and start operation by backwashing (3.4.2)
- De-conserve reverse osmosis (3.4.3.7)
- Fill metering container and start operation (3.4.1)
- Start the operation of the reverse osmosis (3.4.3.8)
3.4.1

Metering Station

NOTE
Pushbutton for venting in "continuous operation" (14/3).
Operating mode on "Manual" (14/2)!
Change the operating mode by pressing the
"Mode" key (14/2).
Modul
Lift
(14/1)
Pre-
chlorination
40%
Antiscalant
40%
Post
clorination
40%
Flocculation
40%
Table 14
Checking pump settings
Adjust the lift only when the
NOTE
pump is running. Danger of
damaging!
30
Frequency Meter-
(14/4)
ing
70%
3.2.2
50%
3.2.3
70%
3.2.4
70%
3.2.5
4
2
Figure 14 Metering station
Service Handbook 08.2004
WTC 600 LP / MP
3
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Waterclean 600 lpWaterclean 600 mpWaterclean 600 pi

Table of Contents