OPERATION OF THE SYSTEM

3
Operation of the System
3.1

Assembly and Starting Operation

Assembly
Checking the scope of delivery (delivery note)
Placing the equipment in the set-up location and positioning
Connecting the untreated water to the WTC 600 LP/MP; connecting
the WTC 600 PI in between, if required (depending on delivery scope)
Installing the piping for backwashing and drinking water
Installing the float switch
Filling and connecting the sand filter and the activated carbon filter
Connecting the electrical system
Table 8
Assembly work to be carried out upon starting operation
Starting Operation
Establishing the untreated water supply
Manually actuating the sand filter backwashing
Manually actuating the activated carbon filter backwashing
Flushing the reverse osmosis
Filling the chemicals container
Adjusting the flow rates
Filling out the metering table in the operating instructions
Instructing the operator (operating instructions)
Table 9
Overview of start-up work
A water analysis with the following values must exist for commissioning of the WTC 600:
- Total hardness GH in °dH
- Iron Fe in mg/l
- Manganese Mn in mg/l
- Ammonium NH
or NH
4
- System yield determined by the sales department (Normal case: 75%, in special cases 50%).
20
in mg/l
3
WTC 600 LP / MP
Chapter
2.2, 3.3.2.1, 3.3.1
2.2
3.3.2.4
3.4.2
SLP, 3.3.2
Chapter
2.2
3.4.2
3.4.2
3.4.3.7
3.2
3.4.3.8
Service Handbook 08.2004