Verifying The At-S63 Version Number; "Verifying The At-S63 Version Number; Powering On A Switch; Chapter 3: Preparing The Switches Of The Stack - Allied Telesis AT-9448Ts Installation Manual

At-9400 series gigabit ethernet switches
Hide thumbs Also See for AT-9448Ts:
Table of Contents

Advertisement

Chapter 3: Preparing the Switches of the Stack

Verifying the AT-S63 Version Number

Powering on a
Switch
52
This phase verifies the version number of the AT-S63 Management
Software on the switches of the stack. The switches must use the same
version and it must be version 3.0.0 or later.
Starting with the top switch of the stack, perform the following procedures:
To power on a switch, perform the following procedure:
1. Position the power cord retaining clip in the up position, as shown in
Figure 17.
1 0 0 - 2
Figure 17. Power Cord Retaining Clip in the Up Position
2. Plug the power cord into the AC power connector on the back panel of
the unit (see Figure 18).
Warning: Power cord is used as a disconnection device. To de-
energize equipment, disconnect the power cord.
Warning: This unit might have more than one power cord. To
reduce the risk of electric shock, disconnect all power cords
before servicing the unit.
4 0 V A
~
C
32
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-9424tsAt-9448ts/xpAt-9424ts/xpT-9424ts

Table of Contents