Chapter 2
Installing the Hardware
This chapter contains an overview of the installation procedures of a stack
and the procedures for the first phase, installing the hardware. The chapter
contains the following sections:
"Installing the Power Cord Retaining Clip (AC Switches Only)" on
page 48
Note
Allied Telesis recommends reading Chapter 1, "Overview," in the
AT-S63 Stack Command Line Interface User's Guide before you
begin the installation. It will be easier for you to install and configure
the stack if you have an understanding of the information in that
chapter.
37