CONTINUE FRAMING AND INSTALLING
INSTALLING INSULATION TO 80ZC
1. Take (1) one piece insulation 8" X 11 1/2" place in middle front.
2. Take (2) two pieces insulation 8" X 10 1/2" place on each side of 8" X 11 1/2". (SEE FIGURE 8)
3. Now place (2) two pieces 8" X 48" over the (3) three pieces just installed. (SEE FIGURE 9)
8" X 10"
TOP VIEW
3. Take the insulation cap and place rear lip of insulation cap under front of pipe starter. Using (4)
four screws provided fasten insulation to top of cabinet. (SEE FIGURE 10)
SIDE VIEW
REAR LIP
PIPE STARTER
FIGURE 8
8" X 11 1/2"
FIGURE 9
8" X 48"
FIGURE 10
INSULATION
Page 11
INSULATION - (3) THREE PIECES
SIDE BY SIDE
8" X 10"
INSULATION - (2) TWO PIECES
ON TOP OF OTHER INSULATION
INSULATION CAP
(2) TWO
SCREWS
(2) TWO
SCREWS
TOP VIEW

Advertisement