Steps For Finalizing The Installation - Travis Industries 33 DVI GSB2 Owner's Manual

Hide thumbs Also See for 33 DVI GSB2:
Table of Contents

Advertisement

24

Steps for Finalizing the Installation

1. Remove the glass (see page 22).
NOTE:
If using propane (LP) convert the appliance prior to installing the media.
2. We recommend you purge the gas line at this time (with the glass removed). This allows gas to be
detected once it enters the firebox, ensuring gas does not build up.
3. Install the four AA batteries (included in the owner's pack) into battery holder (see the illustration
below). The AA batteries act as a power backup in case the household (AC) power goes out and are
required for operation. Install the 9v battery (included in the owner's pack) into control panel light
assembly (see the illustration below). The battery holder is held in place with Velcro and may be
removed for easier access.
4. Install the media (and firebacks, if applicable).
5. Replace the glass.
6. Start the heater.
7. Leak test all gas joints.
© Travis Industries
Finalizing the Installation
Swing the access door and
control cover down to access
the controls on the insert.
AA Battery Tray
4140813
Battery for Control
Panel Lights
AA
Battery
Holder
100-01297

Advertisement

Table of Contents
loading

This manual is also suitable for:

33 dvi

Table of Contents