Crankshaft Inspection - Sym Joyride 125 Service Manual

Hide thumbs Also See for Joyride 125:
Table of Contents

Advertisement

Crankshaft Inspection

Use a thickness gauge to measure left and right
clearance of connecting rod big end.
Service limit:
0.6 mm
Measure the clearance of the big end at the
vertical directions.
Service limit: 0.05 mm
Place the crankshaft on a V-block, measure
run-out of the crankshaft.
Service limit: 0.10 mm
Check crankshaft bearing.
Use hand to crank the bearing to see it moves
freely, smoothly and noiseless.
Check the inner ring to see it links firmly on the
bearing.
If any roughness, noise and loose linkage are
detected, replace the bearing with new one.
Caution
The bearing shall be replaced in pair.
Special tool : outer bearing puller
SYM-6204010
To this chapter contents
12. Crankshaft / Crankcase
Measuring point for the big end of
the connecting rod.
90 mm
60 mm
Outer bearing puller
12-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents