Flywheel Installation; Ac. Generator Installation; Right Crankcase Cover Installation - Sym Joyride 125 Service Manual

Hide thumbs Also See for Joyride 125:
Table of Contents

Advertisement

Flywheel Installation

Insert the pin onto crankshaft.
Make sure that there is no other material stock
on it. If so, clean it up.
Align the key on crankshaft with the flywheel
groove, and then install the flywheel.
Hold the flywheel with flywheel holder, and
tighten its nut.
Torque value: 5.0~6.0 kg-m
Tool:
Flywheel holder
Install spring and oil through.

AC. Generator Installation

Install the A.C.G. set onto right crankcase cover
(3 screws).
Install pulse generator (2 screws).
Tie the wire harness securely onto the indent of
crankcase.
Caution
Make sure that the wire harness is placed
under pulse generator.

Right Crankcase Cover Installation

Install dowel pin and new gasket.
Install right crankcase cover onto the crankcase.
Note that align the water pump shaft indent with
the oil pump shaft.
Install right crankcase cover (9 screws).
Connect water hose to the right crankcase
cover.
Install the water pump cover onto crankcase
cover.
.
To this chapter contents
11. AC. Generator / Start Clutch
2 bolts
3 screws
11-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents