Voltage Inspection - Sym Joyride 125 Service Manual

Hide thumbs Also See for Joyride 125:
Table of Contents

Advertisement

18. Electrical System
Battery
Removal
Remove the battery cover (2 nuts).
Disconnect the negative pole first and then the
positive pole.
Remove the battery.

Voltage inspection

Use the digital voltmeter to check the voltage
of the battery.
Full charged:12.8V ↑(20°C)
Undercharged:12.0 V↓ (20°C)
Warning
Keep flames away while recharging.
Charging is completely controlled by
the ON/OFF switch on the charger, not
by battery cables.
Charging
Connect the positive terminal (+) of the
charger to the battery positive terminal.
Connect the negative terminal (-) of the
charger to the battery negative terminal.
Standard
Charging current
Charging time
5~10 hours
Caution
Never rapid charge the battery unless in
emergency.
Verify the battery is recharged with current
and duration prescribed above.
Large current and fast time to charge will
render damage to the battery.
After installing the battery, coat the cable
terminal with grease.
18-4
To this chapter contents
Maximum
0.9A
4A
1 hour
2 nuts

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents