Removal Of The Pcb - Daikin D-Series Service Manual

Super multi nx d/e series
Hide thumbs Also See for D-Series:
Table of Contents

Advertisement

Outdoor Unit – E Series (68 / 71 / 75 Class), D Series
2.3
Removal of the
Procedure
Step
1. Removing the controller
PCB
Remove the screw of
1
the PCB, and release 2
tabs.
2
Release the tabs of the
terminal board, and
open the terminal
board.
3
Disconnect each
connector on the back
of the terminal board.
Disconnect the
service
4
monitor PCB
connector.
308
PCB
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Si12-619A
Points
Release the tab to remove
the service monitor PCB.
Removal Procedure

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents