Download Print this page

Removal Of Pcb - Daikin 2AMK40FV1B Service Manual Removal Procedure

Outdoor unit 4.0/5.0 kw class

Advertisement

Si12-891

3. Removal of PCB

Procedure
Step
1
Remove the screw and
remove the electrical
box cover.
Detach the insulation
2
sheet.
Remove the 2 screws
3
and remove the
terminal boards.
Removal Procedure
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Procedure
Electrical box cover
Preparation
Remove the panels
according to the "Removal of
Outer Panels".
Remove the electrical box
according to the "Removal of
Electrical Box".
M4 × 12
(R12538)
(R12539)
The trimmed part goes front.
Insulation
sheet
The thermal fuse is united
with terminal board.
Terminal
board
(R12772)
Removal of PCB
Points
9

Advertisement

loading