Removal Of Pcb / Swing Motor - Daikin FTY25GXV1 Service Manual

Removal procedure 2.5/3.5 kw class
Hide thumbs Also See for FTY25GXV1:
Table of Contents

Advertisement

Removal of PCB / Swing Motor

6. Removal of PCB / Swing Motor
Procedure
Step
1. Removing the shelter
1
To remove the shelter
(1), unfasten the hooks
at the upper 2 positions
of the shelter.
2
Unfasten the hook at
the lower position, and
remove the shelter (1).
Lift the shelter (2) and
3
unfasten the 2 hooks.
Slide the shelter (2),
4
and remove.
14
Warning
Be sure to wait 10 minutes or more after turning off all power
supplies before disassembling work.
Procedure
Shelter (1)
Hooks
Shelter (2)
Preparation
Remove the electrical box
Hooks
according to the "Removal
of Electrical Box".
(R8603)
Hook
(R8604)
(R8605)
Si04-859
Points
Removal Procedure

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ftyn35gxv1bFty35gxv1Ftyn25gxv1b

Table of Contents