Removal Of The Electrical Box - Daikin D-Series Service Manual

Super multi nx d/e series
Hide thumbs Also See for D-Series:
Table of Contents

Advertisement

Outdoor Unit – E Series (68 / 71 / 75 Class), D Series
2.2
Removal of the
Procedure
Step
1. Removing the tie wires
1
The figure shows the tie
pipe connections.
2
Remove the terminal
board fitting screw.
304
Electrical BOX
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Si12-619A
Points
Remove the piping in the
backward direction.
Match the colours of the tie
wires to A, B, C and D ports
as follows.
(1) - Black Power
(2) - White Power
(3) - Red Transmission
Wires are fixed to the
terminal board with screws.
Terminal board is made of
integral moulded resin.
Removal Procedure

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents