Appendix A - Site Preparation Kit; Pre-Installation Worksheet; Table A-3. Pre-Installation Activities - HP 3000 9X9/KS Site Preparation And Requirements Manual

Enterprise servers
Hide thumbs Also See for 3000 9X9/KS:
Table of Contents

Advertisement

Appendix A - Site Preparation Kit

This Appendix contains the following information:

Pre-installation Worksheet

Space Planning Kit
System power requirements and heat dissipation worksheets
Hewlett-Packard recommends that you copy the worksheets before you begin using them. Then, if
more copies are needed in the future, you will have an unmarked copy of the worksheets available.
Pre-Installation Worksheet
Timing
6 weeks before installation
At system delivery
System installation
Pre-Installation Activities
Table A-3.
Activity
Select the location for the system. Use the Site
Preparation Guide to satisfy any requirements to
ensure the site is ready when the system arrives.
Assign a person the responsibility of system prin-
cipal operator.
Plan the physical arrangement of the system and
its peripherals. The space planning kit allows you
to plan details before the system arrives.
Order supplies that are required for uninterrupted
operation of the system (consumable supplies).
Inspect each shipment as it is delivered. Note
comments and dates in shipment schedule.
When all equipment arrives, contact the CE to
schedule the installation and verify that the site
meets the system requirements. Installation will
be scheduled within three working days after
Hewlett-Packard has been contacted.
Arrange for the system manager to assist the CE
with the installation process.
.
Date
A-1