A minimum available voltage of 184 V
required before the inverter starts feeding power to the grid.
AC side
Turn ON the AC circuit breaker(s).
DC side
Turn ON the DC switch(es).

3.1. Initial Start

When the inverter is started for the first time, an installation menu is automatically
displayed to enable the configuration of certain critical values and operational settings.
3.1.1. Customizing the Inverter Settings
Single Inverter
• When both the DC and the AC switches are turned ON and the inverter is supplied with
enough power, an installation menu is displayed in the LCD screen.
Multiple Connected Inverters
1. CAN
• Connecting all inverters via the CAN bus enables the configuration of all inverters in a
plant via one inverter. The Start Up can then be carried out on any inverter, and if
configured as the master inverter the configuration settings of time, date, language and
grid settings will be transferred to all the other follower inverters on the network.
Each follower inverter is automatically assigned an ID number from the master during
Start Up.
2. RS-485
• Connecting the inverters via the RS-485 bus enables communication with third party
equipment.
• Each inverter must manually be assigned an ID, a bit rate number and a parity number:
- The ID number must be between 1 and 247.
- Both the master inverter and the follower inverters need a bitrate number and a
parity number. Compare with the setup in the third party equipment (eg. an
external data logger) and write this number in the inverter's network menu. Refer
to section 6.2.4.2 Network Setup of the User Guide for more details.
Defaults are: bitrate – 19200 and parity – none.
Installation Guide DLX seriesL00410622-01
, 230 V
and a power greater than 7 W