If the inverter is set to master, data must be collected from the follower inverters. The
following screen is displayed:
7. Grid Configuration
8. Feeding Phase
If the inverter is set to master, and there is more than one inverter in the plant, the
following screen is displayed:
30
Enter – Call up the list of grid configurations
Up or Down – Select the grid configuration of
the actual installation site:
TN/TT, IT, Undefined
Enter – Confirm
Left – Back
Right – Next
Enter – Confirm
Enter – Call up the list of phases
Up or Down – Select the preferred phase:
- TN/TT: Not set, L1, L2, L3
- IT: Not set, L1-L2, L1-L3, L2-L3
Enter – Confirm
Left – Back
Right – Next
Enter – Confirm
Installation Guide DLX series L00410622-01

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DLX 2.0 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Dlx 2.9Dlx 3.8

Table of Contents