Flueing; Gas Connection - Rinnai FS35 ETR Accessory Installation Manual

Electronic timer and remote operating and installation instructions
Hide thumbs Also See for FS35 ETR:
Table of Contents

Advertisement

This heater requires a minimum 3m. flue.
• Position the heater.
• Suspend a plumbline from the ceiling to
the centre of the flue socket.
• Mark the centre of the flue in the ceiling.
• Make a small hole in the ceiling and double
check that the flue system will be at least
25 mm clear of combustible materials.
• Cut the hole for the flue.
• Fit the ceiling plate, flue and decorative cover.
The decorative cover must be able to slide up to give
access to the flue spigot. The inner flue must be sup-
ported independently of the heater but allowing suffi-
cient movement to allow connections to and
disconnections from the flue spigot.

GAS CONNECTION

RUN GAS SUPPLY
For pipe sizing, refer to your local gas installation codes.
Copper supply should be run leaving a flared connection
at the position shown.
PURGE SUPPLY OF AIR AND SWARF.
All foreign materials such as filings must be purged from
the gas supply, as they may cause the gas valve to
malfunction.
Connect and tighten union.
On completion of work, check for gas leaks.

FLUEING

11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Timberflame fs35 etrFreestanding royale etr

Table of Contents