AG-SS with TDS Monitor Faucet Installation
Note:
If using the AG-SS TDS Monitor Air Gap Faucet , a 1 1/4" hole will be
required.
Step 6
Remove the stem nut and the tubing guide from the faucet.
Make sure the soft rubber gasket remains, so it will be on top
of the counter when installed. From above the sink, feed the
tubing and faucet stem down through the 1¼ inch mounting
hole in the sink.
Step 7
From below the sink, slide the tubing guide up the threaded
stem and follow it with the mounting nut, turning the nut
clockwise until fully tightened.
Insert the blue tubing (part# 610113), into the end of the
Step 8
threaded stem. Make sure to push in firmly to ensure the
tubing is locked in place. (NOTE: this tubing will also be used
for the final filter installation page 13)
Note:
Refer to Black Tube Connection and Red Tube
Connection steps on pages 12 & 13 of this manual to
complete the faucet installation.
Step 9
Remove the spout from the top of the faucet by pulling it
straight upward. Remove the faucet knob by pinching the
two locking tabs inward and then pulling upward on the knob
while the tabs are pinched inward. Push the coin cell battery
into the battery holder behind the circuit board. NOTE: the +
side of the battery goes against the gold metal bracket.
When the battery is iinstalled, the red and green indicator
lights will go through a flashing sequence, followed by
only the green light flashing. At this time, make your TDS
selection on the DIP Switch, only one switch is to be pushed
up. Refer to the chart below to determine which switch you
want to push up.
Step 10
Replace the knob by centering it over the faucet and aligning the trough on the
inside of the faucet knob with the valve lever. Lower the knob making sure the
valve lever slides into the trough, making sure the knob top hole is centered
over the locking tabs. Push the knob all the way down until it locks in place.
Push the spout back into the top of the faucet so that it is fully seated and
push the frosted deflector down until fully seated. You may have to rotate the
deflector until it is in position to be fully seated.
Note:
After completing the installation of your RO system, you should see the
green light flash at the base of the faucet while water is flowing through the
faucet (the red light may flash when system is first turned on, this will
turn green following the initial tank flush).
When the system is ready to be serviced (six to 12 months) you will see the
flashing light switch from green to red, indicating it is time to replace your
filter cartridge(s).
Page 7
SWITCH SELECTION FOR TDS
ON
1
2
3
4
5
6
1 - 30 ppm
5 - 150 ppm
2 - 60 ppm
6 - 200 ppm
3 - 90 ppm
7 - 250 ppm
4 - 120 ppm
8 - 300 ppm
7