Ag-Ss With Monitor Faucet Installation - Watts Premier WP-5 Installation, Operation And Maintanance Manual

Table of Contents

Advertisement

AG-SS with Monitor Faucet Installation - Part# 116061
Note:
If using the AG-SS Monitor Air Gap Faucet , a 1 1/4" hole will be
required.
Gather and identify the faucet pieces.
Step 6
Remove faucet and small parts from plastic bag.
Slip the gasket over the threaded stem to the faucet
flange. From above the sink, feed the tubing and faucet
stem down through the 1¼ inch mounting hole in the
sink.
Step 7
From below the sink, slide the tubing guide up the
threaded stem and follow it with the mounting nut, turning
the nut clockwise until fully tightened.
Insert the blue tubing (part# 610113), into the end of the
Step 8
threaded stem. Push it all the way in and then pull on it
firmly to verify it is locked in place. (NOTE: this tubing will
also be used for the final filter installation page 11)
Note:
Refer to Black Tube Connection and Red Tube
Connection steps on page 11 of this manual to complete
the faucet installation.
Step 9
Remove the spout from the top of the faucet by pulling it
straight upward. SEE DRAWING
Remove the faucet knob by pinching the two locking
tabs inward and then pulling upward on the knob while
the tabs are pinched inward. Push the coin cell battery
into the battery holder behind the circuit board. NOTE:
the + side of the battery goes against the gold metal
Step 10
Replace the knob by centering it over the faucet and aligning the trough on the
inside of the faucet knob with the valve lever. Lower the knob making sure the
valve lever slides into the trough, making sure the knob top hole is centered
over the locking tabs. Push the knob all the way down until it locks in place.
Push the spout back into the top of the faucet so that it is fully seated and
push the frosted deflector down until fully seated. You may have to rotate the
deflector until it is in position to be fully seated.
Note:
After completing the installation of your RO system, you should see the green
light flash at the base of the faucet while water is flowing through the faucet
(the red light may flash when system is first turned on, this will turn
green following the initial tank flush).
When the system is ready to be serviced (six to 12 months) you will see the
flashing light switch from green to red, indicating it is time to replace your filter
cartridge(s).
Page 8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wp5-50Kp-5B-ro5m-50

Table of Contents