5 .
M A I N T E N A N C E
This projector has been designed to provide years of optimum performance while requiring
only routine maintenance and cleaning. However,
periodic maintenance program of scheduled operational checks and preventive maintenance.
5.1.
G
E N E R A L
Use the program outlined in the schedule in Figure 5-1 to maximize projector life and
operating efficiency. Procedures for these operations are described in the referenced sections
of this manual.
Frequency
Daily
Daily
Bi-weekly
Annually
Figure 5-1: Schedule for Periodic Maintenance Operations
* If Necessary
5.2.
V
I S U A L
1. Visually inspect projector for signs of excessive dust, dirt, physical damage, frayed or
damaged cables, and loose hardware.
2. Remove, replace, and repair as necessary.
3. Visually inspect inner, outer, and shutter timing belts. Replace belts that are frayed or show
signs of wear.
4. Check belt tension (Sections 6.4.1, 6.4.2, and 6.4.3) and re-adjust if necessary.
Ultramittent should be visually checked every 30 days. If leak is
detected, contact
Ultramittent. If leak is very slow, you may continue to operate
Ultramittent for 30 to 90 days.
CHRISTIE DIGITAL SYSTEMS CineX35 Projector
May, 2004
M
A I N T E N A N C E
Maintenance Operation
Visual inspection
Clean projector
Oil lateral guides and jewels
Replace belts* and blow out belt dust
I
N S P E C T I O N
CHRISTIE
strongly recommends a
CHRISTIE
to arrange for loan of substitute
5
Section
5.2
5.3
5.3
5.4.2
5-1