Preparation; Site Preparation - Chamberlain LiftMaster Elite CSL24VH Installation Manual

Liftmaster elite series vehicular slide gate operator
Hide thumbs Also See for LiftMaster Elite CSL24VH:
Table of Contents

Advertisement

PREPARATION

SITE PREPARATION

Check the national and local building codes BEFORE installation.
Gate must be constructed and installed according to ASTM F2200 standards (refer to page 4). Gate must fit specifications of operator (refer to specifications).
GATE
SAFETY CATCH ROLLERS
Install catch rollers with safety covers
on the side of a post or wall with a
minimal distance of half an inch
between the rollers and gate.
10
DO NOT use a gate catch post.
Because the coasting distance may vary due to
changes in temperature, it is NOT recommended
to install a stop or catch post in front of the
gate's path. To do so will cause the gate to hit
the post in certain instances.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Liftmaster elite csl24v

Table of Contents