Site Preparation; Check Your Gate - Chamberlain LA 400PKGU Installation Manual

Residential dc vehicular swing gate operator
Table of Contents

Advertisement

SITE PREPARATION

Check the national and local building codes BEFORE installation.
Trench and install conduit. Before trenching, contact underground
utility locating companies. Conduit must be UL approved for low
and high voltage.
Conduit
Entrapment protection devices are required to protect against any
entrapment or safety conditions encountered in your gate
application (refer to pages 20-21 for more details). Install warning
signs on both sides of the gate.
Entrapment Danger

CHECK YOUR GATE

Gate MUST be level. Gate and gate
post MUST be plumb. Gate MUST
have smooth bottom edge, no
protrusions should exist.
INTRODUCTION
TRENCH
SAFETY
Warning Signs
Remove ANY/ALL wheels
from the bottom of gate.
Loops allow the gate to stay open when vehicles are obstructing the
gate path. Suggested for vehicles 14 feet (4.27 m) or longer. Loops
are not required but are recommended.
Gate must be constructed and installed according to ASTM F2200
standards (refer to page 4). Gate must fit specifications of operator
(refer to specifications).
Gate MUST NOT hit or drag
across the ground.
7
LOOPS
(Inside Property)
GATE
Gate MUSTswing freely and
be supported entirely by its
hinges.

Advertisement

Table of Contents
loading

This manual is also suitable for:

La 400La400dcLa400dcs

Table of Contents