Site Preparation

Check the national and local building codes BEFORE installation.
Conduit and Concrete Pad
Trench and install conduit. Before trenching, contact underground utility
locating companies. Conduit must be UL approved for low and high
voltage. Consider the operator placement BEFORE installing the pad or post.
Gate
Gate must be constructed and installed according to ASTM F2200 standards
(refer to page 4). Gate must fit specifications of operator (refer to
specifications).
INTRODUCTION
Safety
Entrapment protection devices are required to protect against any
entrapment or safety conditions encountered in your gate
application. Install a warning sign (two provided) on the inside and
outside of the property, where easily visible.
Additional Accessories
The vehicle loops allow the gate to stay open when vehicles are
obstructing the gate path. Suggested for vehicles 14 feet (4.27 m)
or longer. Vehicle loops are not required but are recommended.
Before installing your Access Control Device(s) be sure to complete
a site survey and determine the best device for your site needs.